Australia: Ph 1300 744 530
Dubai: Ph +971 800 0311 0211
International: Ph +61 7 3077 6044

Cooling Tower Construction

We reconstruct large industrial timber and fibreglass cooling towers, with tower rebuilds a core specialty.
 
 
 

Qualified, Experienced Crew

Skilled trades and supervisors with hands-on cooling tower rebuild experience. Clear scope, disciplined site safety, and workmanship focused on long-term reliability.

Extend Life, Improve Performance

Reconstruction restores structural integrity and airflow/water distribution, helping reduce unplanned outages and bringing ageing towers back to a dependable operating standard.

All Makes and Materials

Timber, FRP and hybrid towers. We assess what can be retained, what must be replaced, and deliver a practical rebuild plan to suit your site and shutdown window.

 

 

If your tower is showing timber decay, corrosion, vibration, persistent leaks, reduced thermal performance, or repeated fill and drift issues, it may be more cost-effective to reconstruct than to keep patching. Contact us to discuss the tower condition, access constraints, and the fastest path to a reliable rebuild.

 

×